University Construction
Being a valued institution of research and education, the University of California, Davis is in a state of constant change and flux. Indeed, some say UCD stands for Under Construction Daily. University construction is guided by the 2003 Long Range Development Plan, which outlines how the university plans to grow between 2003 and 2016. According to this document, the total on-campus population could possibly grow to approximately 51,695 by the end of the '15-'16 academic year. Constructing new buildings and renovating old ones is critical to providing enough space for all these new people.
Campus construction comes with a cost to students, faculty, and staff: Closed Bike Paths, closed parking lots, detours and alternate routes. To keep explorers of the university informed of this fact, the kind fellows in its administration often feel it necessary to erect gigantic colorful signs in front of future construction projects. These signs are so distinctive that there was even a parody of them created by artist Steve Lambert.
These signs generally include a brief description of the widget to be built, along with a dollar figure of how much the project is costing the university (at least, how much it cost at the time they put down the sign). Sometimes they even have sassy concept art. Though many of the signs advertise a web site (http://growthplanning.ucdavis.edu) with news articles related to campus growth, this site gives neither any indication of how many construction projects are currently going on, nor even how many of these delightful signs have been placed. No one has stepped up to fill this void... until now.
Planned and Recently Completed Campus Construction:
[edit | edit source]Central Campus:
[edit | edit source]
- MU Renovation - to be completed in 2015.
- Dorms - The newest phase of Tercero will open in Fall 2014.
- Engineering 4
- Physical Sciences Expansion - completed as EPS in 2009.
- Student Resource Center - completed as Student Community Center in 2012.
- King Hall Renovation & Expansion
- Music Building
- Coffee House renovation and expansion - completed in 2010.
- Segundo Services Center - completed in 2011.
South Campus (Mondavi Center):
[edit | edit source]
- Hotel and Conference Center construction - completed in 2013.
- Graduate School of Management Building construction - completed as Gallagher Hall in 2009.
- The Museum of Art at UC Davis construction
- Teaching and Research Winery and the Anheuser-Busch Brewing and Food Science Laboratory
West and Southwest of Campus:
[edit | edit source]
- Advanced Transportation Infrastructure Research Center
- Health and Wellness Center - completed in 2010.
- School of Veterinary Medicine 3B right next to the Vet Med Instructional Facility
Dormitories:
[edit | edit source]The UC Davis Design and Construction Management web site contains various technical specs on current projects, like projected milestone dates and information on the companies involved in each project. They also provide a colorful map of current campus projects.
R4 Recycling works with DCM to recycle construction waste. Campuswide, R4 diverts over 60% of construction waste!